Hartford Drywall Pros

Drywall in a house you are still living in, across Hartford

One room sealed at a time, the dusty day named before it arrives, and the furniture back where it was before anybody leaves.

What three days of drywall work does to the rest of the house

You get the room back clean, in the number of days you were told, without having to move out to get it.

A zip door taped into a plastic screen across a doorway, the room beyond just visible through the gap

Hartford Drywall Pros is a drywall contractor in Hartford, and most of what four crews do is inside houses people are still sleeping in. Around two hundred and forty jobs a year, and a single room usually books about two weeks out.

One room is three to five days, a ceiling is two days and a drying day, and a whole floor is two to three weeks. Only one of those days is a dusty one and you are told which on the first morning. The room is sealed with a zip door and a fan in the window pulling air out of the house rather than through it, and the flat surfaces are sanded with a vacuum sander and the edges by hand, which is what keeps the dust in that room instead of on the stairs and in the hall.

Do we have to move out? Almost nobody does. A family with one ceiling coming down loses that room for a week and keeps the rest of the house, and the only people we tell to book a few nights elsewhere are those doing a whole floor with a baby or somebody asthmatic in the house.

Call for a free visit at (860) 847-8709. You will stop planning your week around the mess you are dreading and start counting the days until you get the room back!

Cooking, sleeping and where the dust goes while we are in

The work takes three days. Living around it is the part nobody else quotes for.

A contractor wants a schedule and a certificate. You want to know whether you can cook, where the children are sleeping, whether the dog can be let out and what the house looks like on Friday night. So the answers here are about the house rather than about the wall. We work eight to four thirty on weekdays and nobody runs a sander after four. One room is sealed at a time and the rest of the house stays yours. The stairs and the hallway are covered and swept every evening rather than at the end of the job, and the day before the sanding you are told, because that is the one worth planning around.

  • One room sealed at a time, the rest of the house stays yours
  • Eight to half four on weekdays, no sanding after four
  • The dusty day named on the first morning
  • Floors, stairs and hallway covered and swept each evening
  • Furniture moved to the middle, sheeted and taped down
  • Room vacuumed, primed and put back before we leave
A single bedroom doorway zipped shut in plastic sheeting, the landing and stairs beyond it clear and in ordinary use, the rest of the house untouched
Inside that bedroom, the furniture pulled to the center and sheeted, the edges taped to the floor protection while the wall behind sits part hung

Our residential drywall services in Hartford

Commercial Residential
  • Drywall Installation

    For anybody standing in front of bare studs, whether that is an addition you have just had framed, a basement you are finally finishing, or a wall the electrician opened three weeks ago and left. People choose this over a general contractor's own crew because the framing gets straightened before the board is ordered, and that one step is what decides whether the finished wall looks flat.

    Learn more about Drywall Installation
  • Drywall Repair

    For anybody living with damage they have stopped seeing, a tenant with a walk-through booked, or a landlord turning a unit around between lets. People pick this over a handyman because a patch backed on four edges and taped in paper stays flat, while a hole filled from a tub comes back as a visible ring inside a year and shows in every photograph after that.

    Learn more about Drywall Repair
  • Texture and Finishing

    For anybody whose repair is invisible in flat light and obvious in the evening, and for landlords who want one pattern through a building so the next patch is not a guessing game. People choose this over a painter with a hopper because the match is settled on a dried sample board, held against the wall in the light of the room, before the compressor is ever switched on.

    Learn more about Texture and Finishing
  • Ceilings

    For anybody standing under a ceiling that has started to bulge, crack or shed, and for anybody tired of the popcorn texture in every room upstairs. People pick this over a general contractor's crew because the joists get strapped level before any board goes up, and that one step is what decides whether a ceiling reads flat under a window's side light or shows every joint in it.

    Learn more about Ceilings
  • Water Damage Repair

    For anybody who has just found a brown ring over the stairs, a ceiling gone soft after February, or a bathroom that has been leaking into the room below for longer than anyone admits. People call us rather than a general restoration outfit because the meter goes into the framing before the board goes on, and that is what decides whether the repair holds or comes back next winter.

    Learn more about Water Damage Repair

From your first call to the day we sweep up and go

Three to seven days on site for most jobs, and the dust and the noise are done inside the first two.

  1. You call and we listen

    Same day callback

    You tell us what is happening and where. We ask what the house is, roughly when it was built and whether anything has been done to that wall before, because in Hartford the answer is usually yes.

  2. We come and look

    Within a few days

    One of us comes out, measures, and puts a screw into the wall somewhere discreet to find out whether it is board or lath and plaster. The written quote comes after that visit, never before it.

  3. The quote and the date

    Written the same week

    The quote names the board, the thickness, the finish level and the number of days. If something behind the wall changes it, you hear that while we are standing in the room, not on the invoice.

  4. Protection and set up

    First morning

    Floors get covered, doorways get zipped and a fan goes in a window. Furniture moves to the middle of the room and gets sheeted. Nothing is opened up until the room is closed off.

  5. Hanging, taping and sanding

    Two to five days

    Board goes up, joints are taped and three coats of compound go on with a drying day between them. Sanding is the dusty part and it is one day, not five.

  6. Patched and cleared

    Last afternoon

    We prime what we finished so you can actually see it, vacuum the room, take the sheeting and the scrap away, and walk the job with you before anybody leaves.

Call and we will come out, look at the actual wall and tell you what it needs.

Get a free quote

Why is one room quoted higher than another the same size?

Square footage is the smallest part of a drywall price. What the wall already is, what has to come off it first and how good the finish has to look under your own lights account for most of the rest.

What is behind the wall
Board comes off in sheets. Lath and plaster comes off in barrows, and the studs behind it are rarely straight or evenly spaced, so new board has to be shimmed and packed before a screw goes in.
Level of finish
Level 4 is right under paint on most walls. Level 5, a skim over the whole face, is what a big window or a row of downlights needs, and it adds about two days across a room.
Ceilings against walls
Everything overhead is slower. Sheets are lifted above the head, five-eighths board is heavier than half-inch, and every joint is worked above shoulder height, which roughly doubles the labour.
How much has to come out first
Stripping is priced apart from hanging because it is a different day's work. Plaster keys, layered wallpaper, glued panelling and two coats of old texture all have to leave before board arrives.
Access and protection
A third-floor room with a turn in the stair changes what size board can be carried up in one piece. So does a finished floor that has to be protected, and a family living in the house throughout.
Matching what is already there
Patching into a textured or plastered wall is a matching job rather than a filling job. Making a repair disappear under a raking light takes several passes and sometimes a skim across the whole wall.

Which of these apply to your job is settled on the visit rather than on the phone, and the quote says which ones we found. Get a free quote

What it is actually like having us in the house

Can I keep working from home while you are here?

Yes, from any room but the one we are in. Hanging and screwing is the noisy part and it is loud enough to be heard through a wall, so if you take calls all day it is worth knowing that those are the first two mornings. Taping and coating days are quiet enough to work through.

Where do the dogs and cats go while you are working?

Behind a shut door in another part of the house, or out for the day if they are the sort that will push through plastic sheeting. We prop the front door open while board is coming in, which is the moment cats leave, so tell us on the first morning that there is one and we will watch for it.

Will you need our bathroom, our power and our water?

Power yes, water usually, and the bathroom only if you offer it. Compound is mixed with water and the buckets get washed out, so we ask for an outside tap or a utility sink rather than a kitchen one. We bring our own leads and we will not run everything off a single old circuit.

Can we still use the kitchen if its ceiling is off?

Not while the ceiling is open above it, and that is usually two days rather than a week. We sheet the counters and the units the whole time, seal the room at the end of each day and leave the kettle somewhere else in the house. Most people plan the takeaways around those two evenings.

Does somebody have to be in the house all day?

No. Plenty of our customers give us a key or a code and go to work, and we lock up and text at the end of each day. What we do ask for is somebody available on the phone, because these houses throw up questions that are better answered in ten seconds than guessed at.

How loud is it, and when is the worst of it?

The first two days. Screwing board off is a constant high pitched noise, cutting is louder still and taking an old ceiling down is the loudest thing we do. After that it goes quiet, because taping and coating are almost silent. Nobody works before eight or runs a sander after four.

My son has asthma. Should we be somewhere else?

For the sanding day, yes, and it is worth booking that one night out. The room is sealed and vented outside and we use a vacuum sander on the flats, which keeps most of it contained, but gypsum dust is fine enough that no barrier is perfect. Tell us at the quote and we will schedule it.

Do you work weekends if that suits us better?

Occasionally, on a job that has to fit around a family who are all out during the week. It has to be agreed at the quote rather than asked for halfway through, because crews are booked weeks ahead. Compound needs its drying time either way, so a weekend does not make it faster.

How long before the furniture can go back?

The same afternoon we finish. Primer is touch dry in a couple of hours and the room is vacuumed before we take the sheeting off, so the furniture comes back off the middle of the floor that day. What you should wait for is the painter, because putting it all back twice is nobody's idea of a good week.

What happens to the dates if you find something behind a wall?

You hear about it the hour we find it, standing in the room, with what it does to the finish date. Old fire damage, buried openings and pipework in the wrong bay all turn up in these houses. Most of them cost half a day. The ones that cost more get priced before anybody carries on.

Do we take the curtains and the pictures down ourselves?

Please. Anything on the walls, anything on the windows and anything breakable is better out of the room before the first morning, because sheeting stops dust and not ladders. Everything else, including the heavy furniture, we move to the middle and sheet ourselves on day one.

What state is the room in on the last afternoon?

Vacuumed, primed white and empty of our things, with the furniture back where it started. We walk the room with you before anybody leaves and mark anything you are not happy with, because the time to fix a joint is while a crew is still in your driveway with the compound open.

Hartford Drywall Pros

Small repairs start inside two weeks, no matter how far out the big jobs are booked.

Hartford Drywall Pros hangs, tapes, finishes and repairs walls and ceilings across Hartford, in houses that range from new construction to pre-1940 plaster over lath. Four crews finish about two hundred and forty jobs a year, and a small repair usually starts inside two weeks even while a whole floor is booked further out. Trading here since 2007.

What nineteen years in Hartford's oldest houses taught us

  • Nineteen years working pre-1940 lath and plaster, trading since 2007
  • A screw goes into the wall before the quote, so we know board from plaster first
  • Small repairs start inside two weeks, even when the big jobs are booked further out
  • Nor'easters and ice dams are priced into how we protect a ceiling before we open it
  • We prime what we finish, so you can actually see the work before we leave

If a wall has gone soft after a storm, an old ceiling needs opening up, or a room needs drywall from scratch, call (860) 847-8709 and somebody will come and look at it. We will tell you on that visit whether it is board or lath and plaster behind the surface, and the written quote follows the visit, never before it.

(860) 847-8709

Give us a call

office@hartforddrywallpros.com

Send us a message

100 Pearl St, 14th Floor, Hartford, CT, 06103

Where to find us

Request a quote

(860) 847-8709 Get a free quote